Paperless Logo GPaperless Logo GP-Icon pngPaperless Logo G
  • Home
  • Features
    • Workforce
      • Onboarding
      • Competencies
      • Digital Right to Work
      • Workforce
      • Labour
      • Training
    • Timekeeping
      • Time & Attendance
      • Timekeeping
      • Fatigue
    • Briefings
      • COSHH
      • Daily Briefings
      • Permits
      • RAMS
      • Method Statements
      • Risk Assessments
      • Site Inductions
      • Toolbox Talk
    • Checklists
      • Checklists
    • Photos
      • Photos
      • SitePics.io
    • Documents
    • Roll Calls
    • Data Analytics
  • How it Works
  • Pricing
  • Resources
    • Articles
    • Awards
    • Case Studies
    • Downloads
    • Guides
    • Sectors
    • FAQs
    • Network Rail Calendars
  • Login
Book a demo
✕

Method Statement (UK Construction) + (DOCX) Template

26/02/2026
Method Statement Examples Construction

Introduction

If you are searching for a method statement template (DOCX), what you usually want is not “better wording” but a complete, review-ready structure that covers every field a supervisor, H&S reviewer, and site manager expect to see. This article walks through the exact document structure and field groups using dummy data, so you can see where each item belongs and how the sections connect.

If you want the wider context, start with Method Statements in Construction Guide. This article stays focused on one thing: a complete example structure, with every field explained so you can copy the layout without missing key governance details.

A good method statement should read as a controlled document with clear ownership, site context, key controls, permits and hold points, and evidence of briefing and review. That structure aligns with HSE’s description of method statements as a logical sequence that includes control measures.

TD;DR Summary

📌 TL;DR – Method statement template fields and structure

⏱️ Challenge 1: Document control

Problem: Missing author, approval, revision and linked RA makes the MS non-auditable.
Solution: Treat header fields and approvals as required controls, not admin.

🔒 Challenge 2: Site context and interfaces

Problem: Generic scope misses zones, scaffold constraints, traffic interfaces and weather rules.
Solution: Lock location, boundaries, interfaces and restrictions, then reflect them in the method.

⚠️ Challenge 3: Controls without evidence

Problem: Controls are written but not anchored to hold points, inspections or briefing proof.
Solution: Use hold points, inspection evidence refs, revision history and briefing records as proof.

✅ Final Takeaway

A site-ready method statement is a controlled document that ties scope and interfaces to critical controls, permits, hold points and briefing evidence.

Quick Answer..

A method statement is a controlled document that explains, in a logical sequence, how a specific task will be carried out safely, including the control measures and the site constraints that shape the method. It should link to the relevant risk assessment, define permits and hold points, and keep evidence of approval, review, and workforce briefing.

Skip to MS Example and Template

What is a method statement and why it exists

A method statement is a controlled document that explains, in a logical sequence, how a specific task will be carried out safely on a particular site. It translates the risk assessment outputs into a practical plan for delivery, including how the work is set up, what controls must be in place, and what checks prove the controls are working. In other words, the risk assessment helps you decide what could go wrong and what controls are needed, while the method statement explains how the work will be done so those controls actually happen.

It exists because high-risk work often fails at the “delivery” stage, not the “paperwork” stage. People can agree hazards and controls, then still start work without confirming access, permits, exclusion zones, supervision, competence, inspection status, or emergency arrangements. A good method statement prevents that by forcing a site-specific sequence, explicit hold points, and clear ownership, so supervisors can brief the team and stop work when conditions are not met. This aligns with HSE’s framing that method statements describe the job in a logical sequence and include control measures. (hse.gov.uk)

In practice, reviewers also use the method statement as an audit trail. Your template fields (linked RA revision, approvals, revision history, review triggers, briefing records) exist to prove the document is current, authorised, communicated, and updated when conditions change.

Lifecycle loop with six stages from draft to archived, including an update stage that triggers re-briefing.

When a method statement is required in practice on UK sites

You will see method statements required in practice whenever the work has meaningful risk, complex sequencing, multiple interfaces, or tight site constraints. Many principal contractors and clients make them a contractual requirement for specific activities, and they are routinely expected for higher-risk operations where the method, access, and control checks matter as much as the hazard list.

A method statement is typically required or expected when the task involves one or more of the following:

  • Work at height where access, edge protection, weather stops, and rescue planning must be defined and checked

  • Lifting operations, material landing areas, and exclusion zones that must be controlled and held before work proceeds

  • Temporary works constraints or scaffold dependencies where inspection status and change control are critical

  • Significant interface risk, for example multiple trades on the same plots, live traffic routes, or shared laydown areas

  • High consequence hazards, such as falling objects, plant interactions, energised systems, or fragile surfaces

  • Any activity where permits and hold points are used to prevent unsafe starts

For work at height examples in particular, the need is not just “have controls”, but “plan and organise the work so it is carried out safely”, including access arrangements and changing conditions like weather. (hse.gov.uk)

A simple decision rule that works on most sites is:

  • If you can start the task safely using only a generic rule set, the method statement can be short and standardised.

  • If safe start depends on checks, interfaces, permits, inspections, or changing conditions, you need a task and site-specific method statement with explicit hold points and briefing evidence.

Flowchart showing safety briefing types on UK construction sites and when to use inductions, DABs, toolbox talks, RAMS and permits

The method statement is a system, not a narrative

Our example shows what reviewers actually check first: control, ownership, and traceability. This is consistent with HSE’s framing that a method statement describes a job in a logical sequence and includes control measures.

In practice, the “system” is the link between sections. The project background links to the risk assessment. The scope links to interfaces and restrictions. The key controls link to hold points and the step-by-step method. The review triggers link to revision history. The briefing record links to evidence you can produce in an audit.

To keep it structure-first, treat each section as answering one question:

  • What job is this document controlling

  • Who owns it and who approved it

  • What is the site context and what could change

  • What are the critical controls and where do we stop if they are missing

  • What evidence proves it was briefed and reviewed

1) Overview and project information fields

The “Overview / Project Information” block is where you prove this is a live, controlled document for a specific job. Reviewers look for identity, revision, and traceability before they read the method.

Your template’s required fields in this block are all defensible because they each reduce ambiguity:

  • Title, contractor, project, job number, MS reference, revision, issue date: establishes identity and current version.

  • Linked RA and revision: proves the method is aligned to current risk controls, not an old assessment.

  • Site address or location: stops “copy across sites” failures.

  • Client, principal contractor, principal designer: clarifies dutyholder context without turning the MS into a legal essay.

  • Distribution: shows who must receive it and who must be briefed.

When writing this section, the key decision factor is whether the MS can be mistaken for another job. If the answer is yes, add more specificity in the location and scope fields, not more generic prose.

If you want context on how risk assessment outputs should feed into a method statement, use the wider combined governance guide. Risk Assessments Statements Guide

2) Author and approval fields, plus revision control

The “Author and Approval” table is a control, not a formality. It answers who created the method, who reviewed it for safety, and who approved it for delivery on that site. CITB’s method statement guidance explicitly frames a method statement as a communication tool that reflects risk assessment findings, which makes sign-off and review a practical requirement, not a box-tick.

Your table structure is strong because it separates roles:

  • Author: usually the person who understands the task sequence and site constraints.

  • Reviewer: typically checks adequacy of controls, interfaces, and whether the MS reflects the RA.

  • Approver: confirms it is current, workable, and aligned with site rules and permits.

Link this approvals table to two later sections:

  • Review and change management: who signs planned reviews and triggered reviews

  • Revision history: what changed between revisions and who approved the change

A common operational risk is “silent revision drift”, where the header shows Rev C but the method text has not been updated, or the linked RA is still Rev A. Your header field “Linked RA and Revision” is what prevents that.

3) Scope, interfaces, restrictions, standards, and timing

This is where most method statements either become genuinely site-ready or collapse into generic text. The trade-off is simple: the more specific you are about location, interfaces, and restrictions, the less you need to over-explain.

Your template correctly breaks this into usable fields:

  • Location, plots or zones: define where the method applies.

  • Working hours: helps interface planning and supervision.

  • Start and end dates, duration: useful when conditions could change over time, for example seasons and weather exposure.

  • Scope of works: define inclusions in one paragraph, not a list of everything the company can do.

  • Interfaces: other trades, deliveries, pedestrian routes, scaffold alterations, crane lifts.

  • Restrictions: weather dependency, permit conditions, access rules.

Then you reinforce it with narrative fields:

  • Site description: short description that matches the site reality.

  • Site layout summary and access arrangements: where welfare is, where laydown is, delivery booking rules, visitor controls.

Finally, you anchor it to references:

  • Applicable specifications and standards and Reference documents: drawings, manufacturer instructions, TMP, lift plans, temporary works checks.

This section aligns well with work at height planning principles, where the requirement is to assess risk and then organise and plan the work so it is carried out safely.

4) Key controls, resources, competence, and responsibilities

Your “Key Controls Summary” is one of the most valuable structural sections because it pulls critical controls out of the method text so they can be briefed and checked. It is also where reviewers quickly see whether you have identified what must not fail.

A strong key controls table usually does three things:

  1. Groups controls by hazard theme, like work at height, falling objects, manual handling, traffic

  2. Uses control language that can be checked, like “tagged scaffold” rather than “be careful”

  3. Matches the controls that appear later in the method sequence and hold points

Then your template backs it up with delivery capacity:

  • Resources: people, plant, materials, PPE.

  • Competence and training: working at height awareness, manual handling, tool competency, banksman where required, site induction and MS briefing.

Your “Roles and Responsibilities” table is the ownership layer. The real-world constraint here is supervision bandwidth on a busy multi-plot site. If the supervisor is responsible for permits, briefings, and interface control, the method needs to make those responsibilities obvious and limited, not scattered.

One practical addition you already implied is stop-work authority. In your responsibilities section, make clear that operatives can stop work if hold points are not satisfied, then the supervisor confirms whether work resumes.

5) Permits, hold points, and the methodology sequence

This is the part that makes it “site-operable”.

Permits

Your permits table fields are exactly what supervisors need to run the day:

  • Permit type

  • Permit reference

  • Issuing authority

  • Validity

  • Status

The key decision factor is whether a permit is required to start work, required only for certain methods, or conditionally required if a trigger occurs. Your “Hot works permit (if used)” is a good example of conditional permitting.

Hold points

Hold points are where the method stops until a condition is true. Your example uses hold points well because each one prevents a predictable failure, such as going onto a roof before confirming scaffold tags and weather.

For work at height tasks, planning and organisation requirements are explicit in HSE guidance, and hold points are one practical way to demonstrate that planning in a deliverable sequence.

Methodology and sequence of activities

Your seven-step structure covers the expected lifecycle:

  1. Pre-start, induction, mobilisation

  2. Deliveries, unloading, storage

  3. Access set-up and controlled entry

  4. Inspection and setting out

  5. Material transfer and safe storage

  6. Installation works

  7. Completion, housekeeping, demobilisation

To keep it “fields-first”, each step should do three things:

  • State the action

  • State the controls that apply in that step

  • State the evidence or check that proves it was done, even if that evidence is just “supervisor confirmation” recorded in the briefing notes

Plant and equipment inspection records

Your inspection records table is the proof layer for access and lifting equipment. It prevents the common assumption that “scaffold exists, therefore scaffold is safe”.

The fields you included are correct:

  • Item

  • Inspection type

  • Frequency

  • Evidence reference

  • Status

In the example, the evidence reference is “To be confirmed”, which is fine for dummy data, but the structure is what matters.

6) Environment, COSHH, emergencies, review, revisions, and briefing evidence

These sections are often omitted from templates, which is why including them is a good structural signal.

Environmental controls and COSHH

Your template handles the trade-off well:

  • Environmental controls: include the essentials that affect this task, like waste segregation and fuel storage.

  • COSHH: include only if hazardous substances are used.

That “include only if used” rule keeps the MS short and avoids irrelevant content.

Emergency arrangements

Your emergency table includes what site teams actually need in an emergency:

  • Emergency services number

  • Site emergency contact

  • Assembly point

  • Height rescue plan reference

  • Nearest hospital and access route

  • First aid provision

The operational risk here is that people assume “work at height rescue exists” without referencing it. Your “Height rescue plan” field forces the plan reference into the document.

Review and change management

This is where you lock the method to reality. Your review triggers are exactly what should force a re-brief:

  • scope or location change

  • incident or near miss

  • new equipment or interfaces

  • adverse weather impacting work at height

Then you add a planned review interval and sign-off. That makes it auditable.

Revision history

Your revision table structure is correct:

  • revision

  • date

  • change summary

  • changed by

  • approved by

The discipline is in the “change summary”. Keep it specific, like “Added methodology hold points”, not “updated”.

Briefing and acknowledgement

This is your final proof layer, and it should never be treated as an optional add-on.

Your table captures:

  • name, company, signature, date

  • RA briefed yes or no

  • MS briefed yes or no

If you are capturing briefing evidence digitally, this is the point to connect the method statement document to briefing workflows and sign-off records. Safety Briefing App

Do's Don'ts
Link the MS to the correct RA revision Leave the linked RA blank
Define plots, zones, and interfaces Use generic site-wide scope
Use hold points to stop unsafe starts Rely on "be careful" wording
Reference permits and their validity Assume permits are implied
Record inspection evidence references Assume equipment is in date
Capture briefing sign-off evidence Skip who was briefed

Common Method Statement Mistakes That Cause Problems on Site

Many method statements look complete on paper but fail under site conditions. The problem is rarely formatting. It is usually a gap between what the document says and what the site is actually doing that day. When supervisors are under time pressure, vague wording and missing checks translate directly into unsafe starts, rework, or stop-work instructions from the principal contractor.

The most common failures happen where ownership, interfaces, and change control are unclear. A method statement that reads well but cannot be used as a practical control document will create confusion rather than reduce risk.

Below are the mistakes that most often cause problems in practice, and why they matter.

1) Generic scope that does not match the actual work area

A method statement that says “roofing works across site” without defining plots, zones, scaffold elevations, or delivery interfaces is too wide to control anything.

On a multi-plot development, the difference between Plots 101–110 and “site wide” is significant. Scaffold arrangements, pedestrian routes, delivery access, and interface trades may all differ by zone. When the scope is vague, operatives start work in areas that were not properly planned.

Fix: Define location, boundaries, and interfaces clearly, then reflect them in the method sequence and hold points.

 

2) Controls written as statements, not checks

Phrases like “ensure safe access” or “maintain good housekeeping” are intentions, not controls. They cannot be measured, checked, or held.

On site, the question is always: what must be in place before we proceed? If the answer is not explicit, work will continue even when conditions are not compliant.

Fix: Convert control statements into verifiable conditions. For example:

  • “Tagged scaffold in date”

  • “Exclusion zone established and signed”

  • “Weather conditions confirmed suitable before roof access”

Then use hold points to stop work if those conditions are not met.

 

3) No clear link to the current risk assessment revision

A method statement that does not reference the correct risk assessment revision creates version conflict. If the RA is updated after an incident or design change, but the MS still links to an earlier revision, the site team may be working to outdated controls.

This is a common audit finding and can undermine the credibility of the entire document set.

Fix: Include a “Linked RA and Revision” field in the header and update it every time the RA changes. Align review and revision dates across both documents.

 

4) Missing or poorly defined hold points

Hold points are where unsafe work is most often prevented. Without them, teams drift into starting before access is complete, before permits are issued, or before weather conditions are reassessed.

For example, beginning roof installation before confirming scaffold tags and edge protection is a predictable failure in work at height scenarios.

Fix: Define hold points at logical risk transitions, such as:

  • Before first access to height

  • Before lifting or landing materials

  • Before removing controls

  • After scope or weather changes

Make it clear who confirms the hold point and how it is recorded.

 

5) Interfaces not addressed

On busy sites, most risk arises from interaction rather than the task itself. Deliveries crossing pedestrian routes, scaffold changes by another trade, crane lifts over work areas, or shared laydown zones all introduce interface risk.

A method statement that ignores these interfaces may technically describe the task but fail in the real environment.

Fix: List known interfaces in the scope section and reflect them in the method steps. If deliveries require a banksman, or if scaffold changes must be communicated before roof access, state it clearly.

 

6) No ownership or stop-work clarity

If roles and responsibilities are vague, supervision becomes diluted. Operatives may assume the supervisor has checked something, while the supervisor assumes the principal contractor has done so.

Equally important is stop-work authority. If operatives are not empowered to stop when hold points are not satisfied, unsafe starts will continue.

Fix: Define who plans, who checks, who approves, and who can stop work. Keep it practical and specific to the task.

A4 portrait checklist grouped into Preparation, Briefing delivery, and Record keeping, with tick boxes and a final line to record completion.

7) Weak review and change management

Conditions change. Weather shifts, new trades arrive, materials change, or incidents occur. If the method statement does not define review triggers and a clear revision process, it becomes static while the site evolves.

A document that is technically “Rev C” but no longer reflects current conditions is a liability.

Fix: Include:

  • Clear review triggers

  • Planned review interval

  • A disciplined revision history table

  • Re-briefing when changes occur

 

8) No briefing evidence

A method statement that is never briefed might as well not exist. Audits and investigations often focus on whether the workforce understood the controls.

If there is no briefing record, no signatures, and no confirmation that the linked risk assessment was discussed, you cannot prove communication.

Fix: Include a structured briefing and acknowledgement table capturing:

  • Name

  • Company

  • Signature

  • Date

  • RA briefed yes or no

  • MS briefed yes or no

If briefings are managed digitally, the document should clearly link to that evidence trail.

Download Your Free Method Statement Template

Build Clear Method Steps Faster

Use a practical, site-friendly template to document sequence, roles, plant, and controls for clear briefings and easier site delivery.

Free Method Statement Template

Method Statement example

The example below shows a complete worked Method Statement layout, written in a way you can brief on site. Use it as a reference for structure, tone, and the level of detail that is typically expected for a site-ready document.

Roofing Works – Pitched Roof Installation

Method Statement / SWMS

Paperless Construction

1. Overview / Project Information

Method Statement / SWMS Title Roofing Works – Pitched Roof Installation
Contractor Roofing Pro Yorkshire Ltd
Project Meadow View Phase 2
Project / Job Number ROOF-001
MS / SWMS Reference MS-ROOF-001
Revision Rev C
Issue Date 27/02/2026
Linked RA and Revision RA-ROOF-001 Rev C
Site Address / Location Meadow View Estate Phase 2, Oak Lane, North Yorkshire, LS24 5NT
Client Meadow View Developments
Principal Contractor Oakridge Homes Ltd
Principal Designer Meadow View Developments Ltd
Distribution Site Supervisor, Site Manager, Operatives (briefed), Client/PC (as required)

2. Author and Approval

Role Name Position Signature Date
Author L. Brown Site Supervisor   27/02/2026
Reviewer S. Khan H&S Advisor   27/02/2026
Approver A. Patel Site Manager   27/02/2026

Jump to section

✅ Summary / Overview
✅ Introduction and Scope
✅ Assumptions and Exclusions
✅ Specifications and Standards
✅ Timing of Activities
✅ Key Controls
✅ Resources
✅ Roles and Responsibilities
✅ Permits and Hold Points
✅ Methodology / Sequence
✅ Training and Competencies
✅ Plant and Equipment Records
✅ Environmental Controls
✅ COSHH
✅ Emergency Arrangements
✅ Reference Docs
✅ Review and Change Management
✅ Revision History
✅ Briefing Records

Table of Contents

1. Project Information
2. Approvals
3. Summary / Overview
4. Introduction and scope
5. Assumptions, Exclusions and Restrictions
6. Specifications and Standards
7. Timing of Activities
8. Key Controls Summary
9. Resources
10. Roles and Responsibilities
11. Permits and Hold Points
12. Methodology and Sequence of Activities
13. Training and Competencies
14. Plant/Equipment Inspection
15. Environmental Controls
16. COSHH
17. Emergency Arrangements
18. Reference Documents
19. Review and Change Management
20. Revision History
21. Briefing Records

3. Summary / Overview

This method statement describes the safe sequence for installing pitched roof components to designated plots, including material handling, positioning, fixing, housekeeping, and coordination with other trades. It sets out required resources, permits, hold points, key controls, and emergency arrangements for site delivery.

4. Introduction & Scope

Location

Plots 101 to 110 roof zones

Working hours

08:00 - 17:00, Mon-Fri

Start date / End date

01/02/2026 to 01/05/2026

Duration

4 Months

Scope of works

Installation of pitched roof components on timber trusses, including handling and fixing of tiles and ancillary materials

Interfaces

Other trades working on plots, deliveries to laydown area, pedestrian routes near scaffold

Restrictions

Weather dependent works at height; site rules and permit conditions as applicable

Site Description

New residential development with multiple plots and scaffolded elevations. Work is carried out adjacent to other ongoing trades and delivery routes. The work area includes scaffold access points and designated laydown zones.

Site Layout Summary

• Site access via main gate, follow delivery booking rules
• Laydown area: To be confirmed
• Welfare: To be confirmed
• Pedestrian routes segregated from vehicle routes where practicable

Site Access Arrangements

• All workers to be inducted prior to starting work
• Gate controls for vehicles.
• Deliveries to be pre-booked
• All visitors to be accompanies at all times.

5. Assumptions, Exclusions and Restrictions

Assumptions

• Scaffolding is erected, inspected, and tagged before use
• Weather is suitable for safe work at height
• Lifting plans and exclusion zones are implemented where mechanical lifting is used

Exclusions

• Hot works not covered unless a separate permit and RA is issued
• Confined spaces not covered

Restrictions

• Stop work during high winds, lightning, or unsafe conditions
• No unauthorised access to scaffold or roof zones

6. Applicable Specifications and Standards

• Project drawings and roof details: To be confirmed
• Manufacturer instructions for tiles, fixings, membranes used
• Site rules, induction, and traffic management plan (To be confirmed)
• Permits, lifting plans, and temporary works as applicable (To be confirmed)

7. Timing of Activities

Activity Start End Duration
Roofing works for plots To be confirmed To be confirmed To be confirmed

8. Key Controls Summary

Hazard Theme Critical Controls
Working at height Tagged scaffold, edge protection, safe access, weather stop rules
Falling objects Toe boards, brick guards, exclusion zones, tool control
Manual handling Hoists where possible, team lifts, training, route planning
Site traffic Segregation, banksman, delivery booking, signage

9. Resources

People / Staffing

Role Number Notes
Site Supervisor 1 Controls works, interfaces, permits, briefings
Roofing Operatives 2 to 6 Competent installation team
Banksman (as required) 0 to 1 For deliveries and any lifting operations
First Aider (site) To be confirmed Site provision

Plant and Equipment

• Scaffold access equipment as provided and tagged
• Hoist or mechanical handling (if available): To be confirmed
• Battery or 110v tools with RCD protection
• Barriers and signage for exclusion zones

Materials

• Roof tiles and fixings (spec to be confirmed)
• Membranes/underlay (spec to be confirmed)
• Battens, ancillary trims, sealants (as required)
• Waste bags/skips (site provision)

PPE

• Safety boots with toe protection
• Hard hat (as site rules)
• Hi-vis vest/jacket
• Gloves suitable for handling materials
• Eye protection when cutting/grinding
• Hearing protection where required
• RPE subject to dust assessment

Competence

• Working at height awareness
• Manual handling training
• Competent use of power tools
• Banksman training where required
• Site induction and method statement briefing prior to start

10. Roles and Responsibilities

Role Responsibility Name
Site Supervisor Plan and control work, deliver briefings, ensure controls in place To be confirmed
Operatives Follow method, use PPE, report defects, stop work if unsafe To be confirmed
Site Manager Interface management, traffic management, coordination To be confirmed
H&S Adviser Support monitoring and review To be confirmed

11. Permits and Hold Points

Permits

Permit Type Permit Ref Issuing Authority Validity Status
Work at height controls confirmation N/A Site Supervisor Daily In use
Lifting operation permit (if used) To be confirmed Principal Contractor To be confirmed As required
Hot works permit (if used) To be confirmed Principal Contractor To be confirmed As required

Hold Points

• Scaffold inspection tag is in date and access is safe
• Exclusion zone below work area is established where required
• Weather conditions are suitable for safe work at height
• Any lifting plan and appointed persons are confirmed before lifting
• Changes to scope or conditions trigger review and re-brief

12. Methodology / Sequence of Activities

1) Pre-start, induction and mobilisation

• Complete site induction and confirm everyone understands site rules, emergency arrangements, welfare and access routes.
• Supervisor briefs RA and MS, confirms workforce understanding, and completes briefing sign-off.
• Confirm documents are current (RA-ROOF-001 Rev A, MS-ROOF-001 Rev A) and scope for the day is agreed (plots, zones, interfaces).
• Confirm competence for the task (working at height, tool use, supervision, PASMA or lifting roles if applicable).
• Complete pre-use checks for access equipment (scaffold tags, ladders/towers), tools, PPE, and any fall protection equipment if required.
• Check weather and surface conditions before roof access. Apply stop work rule if conditions become unsafe (wind, rain, ice, lightning, poor visibility).

⏸ HOLD POINT

Supervisor confirms briefings, checks, and weather are acceptable before roof access.

2) Deliveries, unloading and storage (ground level)

• Agree delivery slots and unloading location with Site Manager.
• Establish an unloading exclusion zone and use a banksman for reversing and unloading movements.
• Use mechanical aids where possible (telehandler, pallet truck). Team lift awkward items and split loads to reduce manual handling risk.
• Store materials stable, protected from weather, and clear of access routes. Keep fixings boxed and controlled.
• Maintain housekeeping and segregate waste into agreed skips.

3) Access set-up, edge protection and controlled entry

• Confirm scaffold and access systems are installed, inspected and tagged, and not altered.
• Confirm edge protection is in place where required and identify any fragile surfaces or openings, marking or protecting them.
• Establish exclusion zone below roof works with barriers and signage for overhead risk.
• Maintain safe access discipline, do not carry loose items up ladders, use belts or hoisting methods for tools.

⏸ HOLD POINT

No works at height until access, edge protection, and exclusion zones are confirmed in place.

4) Roof inspection and setting out

• Inspect work area for hazards (edges, openings, fragile features, debris) and confirm the substrate is suitable (clean, stable, dry).
• Confirm set-out and sequencing to minimise re-handling and unnecessary roof foot traffic.
• Coordinate with other trades to avoid conflicting activities (for example, scaffold changes or lifting operations over the roof).

5) Material transfer to roof and safe storage

• Move materials to roof level using the safest practicable method (hoist, telehandler, crane, or controlled manual transfer where permitted).
• If lifting is used, follow lift plan, maintain exclusion zones, and use competent slinger/signaller with in-date lifting accessories.
• Store materials away from edges, distributed to avoid overloading, and secured against wind uplift.

⏸ HOLD POINT

No lifting or landing of materials until the landing area and exclusion zones are controlled.

6) Roofing installation works

• Install roofing components to drawings and manufacturer instructions (membranes/underlay, battens/rails/insulation as applicable, then roof coverings and details).
• Maintain edge protection and exclusion zones throughout. Keep tools and materials controlled and away from edges.
• Use safe cutting methods in a designated area, maintain tidy cables, and remove offcuts/packaging regularly.
• Complete detailing at abutments and penetrations and apply temporary weathering if sections cannot be completed the same day.

⏸ HOLD POINT

Supervisor checks fixings, alignment, detailing, and housekeeping at an agreed stage before progressing.

7) Completion, inspection, housekeeping and demobilisation

• Complete final checks for workmanship, weather tightness, and that no loose materials remain. Record snags and rectify before leaving the zone.
• Remove waste and materials safely, lower tools by controlled means, and clear walkways.
• Keep exclusion zones until overhead risk has ended. Do not remove or alter scaffold or edge protection unless authorised.
• Supervisor completes final inspection and hands area back to the Site Manager (if required).

⏸ HOLD POINT

Final supervisor inspection before removing controls and releasing the area.

13. Training / Competence Requirements

• CSCS or equivalent site access requirement (as applicable)
• Working at height awareness
• Manual handling training
• Tool and equipment competency (including manufacturer instruction)
• Scaffold user awareness (do not alter scaffold)
• Banksman / traffic marshal training where required
• Site induction and task briefing prior to start

14. Plant and Equipment Inspection Records

Item Inspection Type Frequency Evidence Ref Status
Scaffold Inspection and tag Weekly To be confirmed In date / TBC
Hoist Thorough exam / pre-use To be confirmed To be confirmed TBC

15. Environmental Controls

• Waste segregated into correct skips
• Fuel to be stored in approved containers

16. COSHH

• Include COSHH assessments only if hazardous substances are used.

17. Emergency Arrangements

Topic Arrangement
Emergency services 999
Site emergency contact John Smith
Assembly point Site Offices
Height rescue plan WAH-RP-001-Rev3
Nearest hospital Leeds Hospital, 12 miles, LS14 7ER
Emergency access Access via Oak Lane, LS24 5NT
First aid provision First Aid available at site offices

18. Reference Documents

• Drawings: To be confirmed
• Lift plan: To be confirmed
• Temporary works checks: To be confirmed

19. Review and Change Management

Review triggers

• Scope, method, or location changes
• Incident, near miss, or unsafe conditions observed
• New equipment, materials, or interfaces introduced
• Adverse weather impacting working at height

Planned review interval

Weekly

Sign off

Role Name Signature Date
       
       
       

20. Revision History

Revision Date Change Summary Changed by Approved by
Rev A 25/02/2026 Initial issue of MS J. Smith A. Patel
Rev B 26/02/2026 Updated risk controls and added methodology hold points J. Smith A. Patel
Rev C 27/02/2026 Minor formatting tidy-up and document index amended L. Brown A. Patel

21. Briefing and Acknowledgement

Confirm the workforce has been briefed MS and understands controls.
Name Company Signature Date RA Briefed (Y/N) MS Briefed (Y/N)
           
           
           

Download Your Free Method Statement Template

Build Clear Method Steps Faster

Use a practical, site-friendly template to document sequence, roles, plant, and controls for clear briefings and easier site delivery.

Free Method Statement Template
Share

Related posts

Risk Assessment Example Construction
26/02/2026

Risk Assessment Example (UK Construction) + (DOCX) Template


Read more
RAMS Examples Construction (3)
25/02/2026

RAMS Template (DOCX) + RAMS Example for UK Construction


Read more
Is AI RAMS compliant in the UK?

What “compliant” really means in practice, and how to align AI drafts with duty-holder responsibilities and evidence.

17/02/2026

Is AI-generated RAMS compliant in the UK? | Guidance


Read more
Still chasing paper RAMS on site?

A simple digital workflow to create, review, brief, and evidence RAMS without chaos.

16/02/2026

RAMS change control on site


Read more

Company

  • About Us
  • Contact Us
  • Compliance
  • Changelog

Compliance

Cyber Essentials Certified

Affiliations

We plant trees with Ecologi C-Tech Club Supporter

Downloads


Apple App Store Icon

Play Store Icon

© 2026 Paperless. All Rights Reserved | Privacy Policy
Book a demo
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.