Paperless Logo GPaperless Logo GP-Icon pngPaperless Logo G
  • Home
  • Features
    • Workforce
      • Onboarding
      • Competencies
      • Digital Right to Work
      • Workforce
      • Labour
      • Training
    • Timekeeping
      • Time & Attendance
      • Timekeeping
      • Fatigue
    • Briefings
      • COSHH
      • Daily Briefings
      • Permits
      • RAMS
      • Method Statements
      • Risk Assessments
      • Site Inductions
      • Toolbox Talk
    • Checklists
      • Checklists
    • Photos
      • Photos
      • SitePics.io
    • Documents
    • Roll Calls
    • Data Analytics
  • How it Works
  • Pricing
  • Resources
    • Articles
    • Awards
    • Case Studies
    • Downloads
    • Guides
    • Sectors
    • FAQs
    • Network Rail Calendars
  • Login
Book a demo
✕

RAMS Template (DOCX) + RAMS Example for UK Construction

25/02/2026
RAMS Examples Construction (3)

What is a RAMS?

A RAMS is a Risk Assessment and Method Statement document used to plan work safely and demonstrate how risks will be controlled on site. This page explains what to include, what can be optional, and then provides a worked RAMS example you can copy, followed by a DOCX template download. First, if you need the full context on duties, approval expectations, and best practice, start with Ultimate Guide to RAMS.

TD;DR Summary

📌 TL;DR – RAMS Example and RAMS Template

⏱️ Challenge 1: Generic RAMS that fails review

Problem: RAMS is copied and not aligned to the job, location, or constraints, so reviewers reject it or it becomes unusable on site.
Solution: Use a consistent structure, then tailor scope, access, sequencing, hazards, and controls to the specific site and activity.

🔒 Challenge 2: Interfaces, permits, and hold points missing

Problem: RAMS does not define interfaces, permit needs, isolations, or stop work triggers, so control breaks down during delivery.
Solution: Add clear interface controls, permit requirements, and hold points that supervisors can brief and verify before proceeding.

⚠️ Challenge 3: Briefing and sign-off not evidenced

Problem: Teams are not briefed consistently, or sign-off is not captured properly, leaving gaps in compliance evidence.
Solution: Define briefing method, re-brief triggers, and sign-off recording so the live RAMS aligns with what was actually briefed.

✅ Final Takeaway

A strong RAMS is not longer, it is clearer: a site-specific sequence of work linked to practical controls, with interfaces, permits, and briefing evidence that match how the job will be run.

Quick Answer..

A RAMS example shows you the expected structure and level of detail, while a RAMS template gives you a repeatable DOCX format you can adapt quickly. Use a controlled template for consistent sections, then update the site context, interfaces, sequence, hazards, controls, permits, and briefing and sign-off evidence for the actual job before work starts. Skip to RAMS Example and Template

What RAMS is and why it exists

RAMS combines two things: the risk assessment (what could go wrong and the controls) and the method statement (how the work will be carried out safely). In practice, it is the document many clients, principal contractors, and rail or infrastructure frameworks expect to see before allowing work to start.

A good RAMS is not paperwork for its own sake. It is a practical plan that helps supervisors brief the team, coordinate interfaces, and prove that key controls were understood and followed.

Five-step workflow showing build, review, approve, brief workforce, save evidence

When RAMS is required in practice

RAMS is commonly required where the work introduces meaningful risk, the site has constraints or interfaces, or the client demands pre-approval before mobilisation. Even for routine activities, you may still need RAMS where the location, access, sequencing, or adjacent operations create additional hazards.

Typical triggers include:

  • High-risk activities or higher consequence hazards (work at height, lifting, excavations, live services, temporary works)

  • Principal contractor or client control of permits and approvals

  • Interface-heavy sites (multiple trades, public interfaces, live environments)

  • Rail and infrastructure requirements (additional assurance, access rules, possessions, isolations)

  • Works that need formal briefings, sign-off, and record keeping for audits

Flowchart showing safety briefing types on UK construction sites and when to use inductions, DABs, toolbox talks, RAMS and permits

Typical RAMS sections (what to include)

Document control and approvals

This section establishes version control, ownership, and approval status. It should make it obvious who authored the RAMS, who reviewed it, what version is current, and what change triggers require re-issue. This is how you prevent outdated RAMS being used on site.

Project and site context

Set out where the work is happening and what site constraints matter. This is where you describe access, working areas, boundaries, welfare, local rules, and anything that affects how the job is actually delivered. Good context stops “generic RAMS” that do not match the real site.

Scope and interfaces

Define what is included, what is excluded, and where you interface with others. Interfaces are one of the most common failure points, so this section should explain coordination points like shared access routes, sequencing with other trades, deliveries, isolations, or temporary works dependencies.

Task breakdown and sequence of work

Describe the work in a logical sequence. Keep it site-realistic, with hold points where checks or approvals must occur before proceeding. The sequence should line up with how a supervisor would actually run the activity on site.

Hazards, risks, and control measures

This is the risk assessment core. It should identify the key hazards, who might be harmed, and the controls required to reduce risk to an acceptable level. Avoid listing every possible hazard generically. Focus on the hazards that genuinely apply to the job and location, and make controls specific enough to brief and check.

Resources (people, plant, materials)

State what is required to deliver the work safely: competent roles, supervision, plant and equipment, and materials. This is also where you clarify constraints like plant exclusion zones, lifting accessories, inspection status, and any manufacturer requirements that affect safe use.

Competence, training, and PPE

Explain what competence is required and how it will be verified. Include any role-specific tickets or training expectations where relevant, and describe PPE as a control, not as a substitute for engineering or procedural controls. This is also where you align inductions, briefings, and toolbox talks to the task risk.

Permits, isolations, and temporary works (where relevant)

If the job involves permits or isolations, define what permits are needed and what the stop-work rule is if they are not in place. For temporary works, clarify design checks, inspections, and responsibilities so the RAMS does not “assume it is covered elsewhere” without stating the control.

Environmental and public protection controls

Where the work could impact the environment or the public, describe the controls: spill response, dust and noise management, waste handling, barriers, signage, traffic and pedestrian separation, and any site-specific restrictions. This section is often required on constrained sites even where the task itself is routine.

Emergency arrangements and rescue planning

Include emergency actions relevant to the task and site. If the work includes work at height, lifting, confined spaces, or remote areas, the plan should go beyond “call 999” and describe practical steps, rescue equipment, and who coordinates the response.

Briefing and sign-off

This is where RAMS becomes operational. State how the RAMS will be briefed, how questions will be handled, how attendance and understanding will be confirmed, and what re-brief triggers exist. If you want to run briefings digitally and keep the sign-off evidence tied to the live RAMS record, use RAMS Briefing App once briefing and sign-off is discussed.

Optional sections and when to include them

Programme or timing tables

Optional unless the sequence creates risk, the work is phased across multiple days, or the site requires strict time windows. Add timing detail when it helps control interfaces, access restrictions, or permit windows.

COSHH assessments

Optional unless substances are used that require COSHH controls. Include it when adhesives, resins, solvents, fuels, cleaning chemicals, or dust generating activities create exposure routes that need specific controls and briefings.

Lifting plans

Optional unless lifting operations occur. Where lifts are complex, high consequence, or require appointed person planning, include a lifting plan reference and the key controls that must be briefed and enforced.

Temporary works design notes

Optional unless temporary works are involved. Include temporary works controls when the activity relies on designed supports, propping, edge protection, scaffolds, formwork, or any engineered stability measure.

Inspection records and certificates

Optional if inspections are governed in another controlled system, but still reference what must be inspected, by whom, and when. Include it when the job depends on inspected equipment like lifting accessories, harnesses, scaffold tags, or electrical test status.

Common RAMS mistakes that cause problems on site

Generic sequencing that does not match the actual site constraints and interfaces, which leads to supervisors improvising. Missing interface controls, especially where multiple trades share access, lifting zones, or isolations.

Permits referenced without stating exactly what is required and the stop-work rule if a permit is missing. Controls written as vague statements rather than briefable actions, so the team cannot be checked against the RAMS during the job.

No clear review triggers, so changes in scope, method, or conditions do not result in a re-brief and re-issue, which is a common audit failure point.

Download Your Free RAMS Template

Build Clear Method Steps Faster

Use a practical, site-friendly template to document sequence, roles, plant, and controls for clear briefings and easier site delivery.

Free RAMS Template

RAMS example

The example below shows a complete worked RAMS layout, written in a way you can brief on site. Use it as a reference for structure, tone, and the level of detail that is typically expected for a site-ready document.

RAMS Pack - Roofing Works Example

Risk Assessment + Method Statement / SWMS

Paperless Construction

1. Overview / Project Information

RAMS Title RAMS Pack - Roofing Works
Contractor Roofing Pro Yorkshire Ltd
Project Meadow View Phase 2
Project / Job Number ROOF-001
RAMS Reference RAMS-ROOF-001
Revision Rev C
Issue Date 27/02/2026
Site Address / Location Meadow View Estate Phase 2, Oak Lane, North Yorkshire, LS24 5NT
Client Meadow View Developments Ltd
Principal Contractor Oakridge Homes Ltd
Principal Designer Meadow View Developments Ltd
Distribution Site Supervisor, Site Manager, Operatives (briefed), Client/PC (as required)

2. Author and Approval

Role Name Position Signature Date
Author L. Brown Site Supervisor   27/02/2026
Reviewer S. Khan H&S Advisor   27/02/2026
Approver A. Patel Site Manager   27/02/2026

Jump to section

✅ Overview and Project Information
✅ Author and Approval
✅ Summary / Overview
✅ Table of Contents
✅ Pack Purpose
✅ Introduction and Scope
✅ Assumptions and Exclusions
✅ Risk Assessment
✅ Key Controls
✅ Resources
✅ Roles and Responsibilities
✅ Permits / Hold Points
✅ Methodology / Sequence
✅ Plant and Equipment Inspections
✅ Environmental Controls
✅ COSHH
✅ Emergency Arrangements
✅ Reference Docs
✅ Review and Sign Off
✅ Revision History
✅ Briefing Records

Table of Contents

1. Project Information
2. Approvals
3. Summary / Overview
4. Introduction and scope
5. Assumtions, Exclusions and Restrictions
6. Specifications and Standards
7. Timing of Activities
8. Risk Assessment (RA)
9. Key Controls Summary
10. Resources
11. Roles and Responsibilities
12. Permits and Hold Points
13. Methodology and Sequence of Activities
14. Plant/Equipment Inspection
15. Environmental Controls
16. COSHH
17. Emergency Arrangements
18. Reference Documents / Applicable Standards
19. Review and Sign Off
20. Revision History
21. Briefing Records

3. Summary / Overview

This RAMS pack provides a consolidated set of documents describing hazards, controls, responsibilities, and the safe system of work for the described activity. Sections marked Optional may be removed if not applicable, provided hazard controls, emergency arrangements, approvals, and revision control remain in place.

4. Introduction & Scope

Location

Plots 101 to 110 roof zones

Working hours

08:00 - 17:00, Mon-Fri

Start date / End date

01/02/2026 to 01/05/2026

Duration

4 Months

Scope of works

Installation of pitched roof components on timber trusses, including handling and fixing of tiles and ancillary materials

Interfaces

Other trades working on plots, deliveries to laydown area, pedestrian routes near scaffold

Restrictions

Weather dependent works at height; site rules and permit conditions as applicable

Site Description

New residential development with multiple plots and scaffolded elevations. Work is carried out adjacent to other ongoing trades and delivery routes. The work area includes scaffold access points and designated laydown zones.

Site Layout Summary

• Site access via main gate, follow delivery booking rules
• Laydown area: To be confirmed
• Welfare: To be confirmed
• Pedestrian routes segregated from vehicle routes where practicable

Site Access Arrangements

• All workers to be inducted prior to starting work
• Gate controls for vehicles.
• Deliveries to be pre-booked
• All visitors to be accompanies at all times.

5. Assumptions, Exclusions and Restrictions

Assumptions

• Scaffolding is erected, inspected, and tagged before use
• Weather is suitable for safe work at height
• Lifting plans and exclusion zones are implemented where mechanical lifting is used

Exclusions

• Hot works not covered unless a separate permit and RA is issued
• Confined spaces not covered

Restrictions

• Stop work during high winds, lightning, or unsafe conditions
• No unauthorised access to scaffold or roof zones

6. Applicable Specifications and Standards

• Project drawings and roof details: To be confirmed
• Manufacturer instructions for tiles, fixings, membranes used
• Site rules, induction, and traffic management plan (To be confirmed)
• Permits, lifting plans, and temporary works as applicable (To be confirmed)

7. Timing of Activities

Activity Start End Duration
Roofing works for plots To be confirmed To be confirmed To be confirmed

8. Risk Assessment

Risk Assessment Summary Register (key risks)

No. Hazard / risk Who may be harmed Potential harm Key controls required Residual risk
1 Falls from height at roof edges Operatives, supervisors Major injury or fatality
  • Edge protection or other collective protection in place before access
  • Controlled access points
  • No work near edges without agreed protection
  • Maintain safe edge discipline where practicable
  • Active supervision and monitoring
Medium
2 Falls through fragile surfaces or openings Operatives, others below Major injury or fatality
  • Identify fragile areas during roof inspection
  • Mark and barrier fragile zones
  • Use crawl boards or covers where needed
  • Prevent access to unsafe areas
  • Brief fragile roof rules
Medium
3 Falling objects from roof level People below, operatives Head injury, fractures
  • Exclusion zones below roof works with barriers and signage
  • Tool lanyards where applicable
  • Controlled storage away from edges
  • Toe boards or debris protection where installed
  • Tidy workface and waste management
Medium
4 Unsafe access or defective scaffold, ladders, towers Operatives, supervisors Falls, serious injury
  • Scaffold inspected and tagged
  • No unauthorised alterations
  • Access equipment pre-use checks
  • Ladders only for short duration and light duty
  • Maintain clear access routes
Medium
5 Manual handling of sheets, rolls, insulation and fixings Operatives Strains, sprains, MSD
  • Plan lifts and storage to minimise re-handling
  • Mechanical aids where practicable
  • Team lifts for bulky items
  • Weight limits and task rotation
  • Clear walkway and laydown areas
Low
6 Slips, trips and falls on roof (wet surfaces, debris, trailing leads) Operatives Sprains, fractures
  • Housekeeping standards
  • Keep access routes clear
  • Manage leads and hoses
  • Remove offcuts and packaging regularly
  • Stop work if surfaces become unsafe
Medium
7 Weather exposure (wind uplift, rain, ice, lightning, heat) Operatives, supervisors Falls, cold stress, heat stress
  • Stop-work thresholds for wind and lightning
  • Check forecast and live conditions
  • Secure materials against uplift
  • Warm-up or hydration breaks
  • PPE suitable for conditions
Medium
8 Cuts and abrasions from knives, sheet edges, cutting tools Operatives Lacerations
  • Suitable gloves and sleeves
  • Safe cutting method and direction
  • Guarded tools where applicable
  • Blade control and safe disposal
  • First aid provision confirmed
Low
9 Plant and vehicle interface during deliveries and unloading Operatives, drivers, others nearby Crush injury, collision
  • Delivery plan and designated unloading zone
  • Banksman for reversing
  • Segregated pedestrian routes
  • Exclusion zones during lifts
  • Clear communication and agreed signals
Medium
10 Hot works or ignition sources (only if applicable) Operatives, others nearby Burns, fire
  • Avoid hot works where possible
  • Hot works permit if required
  • Fire watch and extinguishers
  • Remove combustibles
  • Separate RA and COSHH as needed
Medium

9. Key Controls Summary

Hazard Theme Critical Controls
Working at height Tagged scaffold, edge protection, safe access, weather stop rules
Falling objects Toe boards, brick guards, exclusion zones, tool control
Manual handling Hoists where possible, team lifts, training, route planning
Site traffic Segregation, banksman, delivery booking, signage

10. Resources

People / Staffing

Role Number Notes
Site Supervisor 1 Controls works, interfaces, permits, briefings
Roofing Operatives 2 to 6 Competent installation team
Banksman (as required) 0 to 1 For deliveries and any lifting operations
First Aider (site) To be confirmed Site provision

Plant and Equipment

• Scaffold access equipment as provided and tagged
• Hoist or mechanical handling (if available): To be confirmed
• Battery or 110v tools with RCD protection
• Barriers and signage for exclusion zones

Materials

• Roof tiles and fixings (spec to be confirmed)
• Membranes/underlay (spec to be confirmed)
• Battens, ancillary trims, sealants (as required)
• Waste bags/skips (site provision)

PPE

• Safety boots with toe protection
• Hard hat (as site rules)
• Hi-vis vest/jacket
• Gloves suitable for handling materials
• Eye protection when cutting/grinding
• Hearing protection where required
• RPE subject to dust assessment

Competence

• Working at height awareness
• CSCS card (or equivalent site access requirement, as applicable)
• Site induction and task briefing prior to start
• Method statement briefing prior to start
• Working at height awareness
• Manual handling training
• Tool and equipment competency (including manufacturer instructions)
• Competent use of power tools
• Scaffold user awareness (do not alter scaffolding)
• Banksman / traffic marshal training (where required)

11. Roles and Responsibilities

Role Responsibility Name
Site Supervisor Plan and control work, deliver briefings, ensure controls in place To be confirmed
Operatives Follow method, use PPE, report defects, stop work if unsafe To be confirmed
Site Manager Interface management, traffic management, coordination To be confirmed
H&S Adviser Support monitoring and review To be confirmed

12. Permits and Hold Points

Permits

Permit Type Permit Ref Issuing Authority Validity Status
Work at height controls confirmation N/A Site Supervisor Daily In use
Lifting operation permit (if used) To be confirmed Principal Contractor To be confirmed As required
Hot works permit (if used) To be confirmed Principal Contractor To be confirmed As required

Hold Points

• Scaffold inspection tag is in date and access is safe
• Exclusion zone below work area is established where required
• Weather conditions are suitable for safe work at height
• Any lifting plan and appointed persons are confirmed before lifting
• Changes to scope or conditions trigger review and re-brief

13. Methodology / Sequence of Activities

1) Pre-start, induction and mobilisation

• Complete site induction and confirm everyone understands site rules, emergency arrangements, welfare and access routes.
• Supervisor briefs RA and MS, confirms workforce understanding, and completes briefing sign-off.
• Confirm documents are current (RA-ROOF-001 Rev A, MS-ROOF-001 Rev A) and scope for the day is agreed (plots, zones, interfaces).
• Confirm competence for the task (working at height, tool use, supervision, PASMA or lifting roles if applicable).
• Complete pre-use checks for access equipment (scaffold tags, ladders/towers), tools, PPE, and any fall protection equipment if required.
• Check weather and surface conditions before roof access. Apply stop work rule if conditions become unsafe (wind, rain, ice, lightning, poor visibility).

⏸ HOLD POINT

Supervisor confirms briefings, checks, and weather are acceptable before roof access.

2) Deliveries, unloading and storage (ground level)

• Agree delivery slots and unloading location with Site Manager.
• Establish an unloading exclusion zone and use a banksman for reversing and unloading movements.
• Use mechanical aids where possible (telehandler, pallet truck). Team lift awkward items and split loads to reduce manual handling risk.
• Store materials stable, protected from weather, and clear of access routes. Keep fixings boxed and controlled.
• Maintain housekeeping and segregate waste into agreed skips.

3) Access set-up, edge protection and controlled entry

• Confirm scaffold and access systems are installed, inspected and tagged, and not altered.
• Confirm edge protection is in place where required and identify any fragile surfaces or openings, marking or protecting them.
• Establish exclusion zone below roof works with barriers and signage for overhead risk.
• Maintain safe access discipline, do not carry loose items up ladders, use belts or hoisting methods for tools.

⏸ HOLD POINT

No works at height until access, edge protection, and exclusion zones are confirmed in place.

4) Roof inspection and setting out

• Inspect work area for hazards (edges, openings, fragile features, debris) and confirm the substrate is suitable (clean, stable, dry).
• Confirm set-out and sequencing to minimise re-handling and unnecessary roof foot traffic.
• Coordinate with other trades to avoid conflicting activities (for example, scaffold changes or lifting operations over the roof).

5) Material transfer to roof and safe storage

• Move materials to roof level using the safest practicable method (hoist, telehandler, crane, or controlled manual transfer where permitted).
• If lifting is used, follow lift plan, maintain exclusion zones, and use competent slinger/signaller with in-date lifting accessories.
• Store materials away from edges, distributed to avoid overloading, and secured against wind uplift.

⏸ HOLD POINT

No lifting or landing of materials until the landing area and exclusion zones are controlled.

6) Roofing installation works

• Install roofing components to drawings and manufacturer instructions (membranes/underlay, battens/rails/insulation as applicable, then roof coverings and details).
• Maintain edge protection and exclusion zones throughout. Keep tools and materials controlled and away from edges.
• Use safe cutting methods in a designated area, maintain tidy cables, and remove offcuts/packaging regularly.
• Complete detailing at abutments and penetrations and apply temporary weathering if sections cannot be completed the same day.

⏸ HOLD POINT

Supervisor checks fixings, alignment, detailing, and housekeeping at an agreed stage before progressing.

7) Completion, inspection, housekeeping and demobilisation

• Complete final checks for workmanship, weather tightness, and that no loose materials remain. Record snags and rectify before leaving the zone.
• Remove waste and materials safely, lower tools by controlled means, and clear walkways.
• Keep exclusion zones until overhead risk has ended. Do not remove or alter scaffold or edge protection unless authorised.
• Supervisor completes final inspection and hands area back to the Site Manager (if required).

⏸ HOLD POINT

Final supervisor inspection before removing controls and releasing the area.

14. Plant and Equipment Inspection Records

Item Inspection Type Frequency Evidence Ref Status
Scaffold Inspection and tag Weekly To be confirmed In date / TBC
Hoist Thorough exam / pre-use To be confirmed To be confirmed TBC

15. Environmental Controls

• Waste segregated into correct skips
• Fuel to be stored in approved containers

16. COSHH

• Include COSHH assessments only if hazardous substances are used.

17. Emergency Arrangements

Topic Arrangement
Emergency services 999
Site emergency contact John Smith
Assembly point Site Offices
Height rescue plan WAH-RP-001-Rev3
Nearest hospital Leeds Hospital, 12 miles, LS14 7ER
Emergency access Access via Oak Lane, LS24 5NT
First aid provision First Aid available at site offices

18. Reference Documents

• Drawings: To be confirmed
• Lift plan: To be confirmed
• Temporary works checks: To be confirmed

19. Review and Sign Off

Review triggers

• Scope, method, or location changes
• Incident, near miss, or unsafe conditions observed
• New equipment, materials, or interfaces introduced
• Adverse weather impacting working at height

Planned review interval

Weekly

Sign off

Role Name Signature Date
       
       
       

20. Revision History

Revision Date Change Summary Changed by Approved by
Rev A 25/02/2026 Initial issue of RAMS pack J. Smith A. Patel
Rev B 26/02/2026 Updated risk controls and added methodology hold points J. Smith A. Patel
Rev C 27/02/2026 Minor formatting tidy-up and document index amended L. Brown A. Patel

21. Briefing and Acknowledgement

Confirm the workforce has been briefed on RA and MS and understands controls.
Name Company Signature Date RA Briefed (Y/N) MS Briefed (Y/N)
           
           
           

Download Your Free RAMS Template

Build Clear Method Steps Faster

Use a practical, site-friendly template to document sequence, roles, plant, and controls for clear briefings and easier site delivery.

Free RAMS Template
Share

Related posts

Risk Assessment Example Construction
26/02/2026

Risk Assessment Example (UK Construction) + (DOCX) Template


Read more
Method Statement Examples Construction
26/02/2026

Method Statement (UK Construction) + (DOCX) Template


Read more
Is AI RAMS compliant in the UK?

What “compliant” really means in practice, and how to align AI drafts with duty-holder responsibilities and evidence.

17/02/2026

Is AI-generated RAMS compliant in the UK? | Guidance


Read more
Still chasing paper RAMS on site?

A simple digital workflow to create, review, brief, and evidence RAMS without chaos.

16/02/2026

RAMS change control on site


Read more

Company

  • About Us
  • Contact Us
  • Compliance
  • Changelog

Compliance

Cyber Essentials Certified

Affiliations

We plant trees with Ecologi C-Tech Club Supporter

Downloads


Apple App Store Icon

Play Store Icon

© 2026 Paperless. All Rights Reserved | Privacy Policy
Book a demo
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.