Paperless Logo GPaperless Logo GP-Icon pngPaperless Logo G
  • Home
  • Features
    • Workforce
      • Onboarding
      • Competencies
      • Digital Right to Work
      • Workforce
      • Labour
      • Training
    • Timekeeping
      • Time & Attendance
      • Timekeeping
      • Fatigue
    • Briefings
      • COSHH
      • Daily Briefings
      • Permits
      • RAMS
      • Method Statements
      • Risk Assessments
      • Site Inductions
      • Toolbox Talk
    • Checklists
      • Checklists
    • Photos
      • Photos
      • SitePics.io
    • Documents
    • Roll Calls
    • Data Analytics
  • How it Works
  • Pricing
  • Resources
    • Articles
    • Awards
    • Case Studies
    • Downloads
    • Guides
    • Sectors
    • FAQs
    • Network Rail Calendars
  • Login
Book a demo
✕

Writing an Effective Method Statement

17/12/2023

How to Write a Method Statement

In construction, a method statement is a critical document that ensures tasks are completed safely, efficiently, and in line with legal and contractual requirements. This guide will walk you through the process of writing an effective method statement, breaking down its essential components and exploring key considerations.

What Should Be Included in a Method Statement?

A method statement provides a detailed description of how a task will be carried out, including the specific steps involved, safety precautions, and the people responsible for each aspect. Here's what you should include:

  1. Scope of Work: Clearly define the scope of the project or task. Include a brief overview that outlines what the work involves and the objectives of the task. This ensures all stakeholders have a clear understanding of what will be covered.

  2. Task Description: This section breaks down the work into manageable steps. Each step should be detailed enough that someone unfamiliar with the project can follow the process.

  3. Risk Assessment: Identifying potential hazards is crucial. List the risks associated with the task and the control measures that will be implemented to mitigate them. This could include safety gear, restricted access zones, and environmental considerations.

  4. Roles and Responsibilities: Specify who will be responsible for each aspect of the work. Whether it’s supervising safety measures, conducting the actual work, or managing subcontractors, assigning responsibility ensures accountability.

  5. Tools and Equipment: Include a list of tools, machinery, and any other resources required for the task, ensuring everything complies with safety regulations.

  6. Control Measures: These are the steps taken to reduce risks identified in the risk assessment. This may involve using protective equipment, following environmental protocols, or maintaining safe working conditions.

Method Statement Toolkit

Struggling with Method Statements?

Unlock our advanced templates, expert tips, and real-world examples inside the Complete Method Statement Ebook for just £27 — plus free access to RAMS GPT to generate professional RAMS instantly.

Download Now

Key Considerations When Writing a Method Statement

When creating a method statement, it’s important to focus on clarity and compliance. Here are the key points to consider:

  1. Clarity and Simplicity: Method statements should be clear and concise. Avoid complex language and ensure the document is easy to understand for all team members, especially those on the ground who will be following it. Using simple diagrams or checklists can enhance understanding.

  2. Compliance with Regulations: Ensure the method statement aligns with local regulations and industry standards. This includes health and safety legislation, environmental laws, and any sector-specific requirements. Regularly updating your method statement to reflect changes in legislation is vital.

  3. Stakeholder Consultation: Engage with relevant stakeholders, including project managers, safety officers, and contractors. Collaboration ensures the method statement covers all necessary details and highlights any concerns from different departments.

  4. Environmental Considerations: Particularly on construction sites, environmental factors can impact the task at hand. Consider waste management, emissions, and noise control. A well-written method statement will address how to minimise environmental harm.

Who is Responsible for Writing a Method Statement?

Responsibility for writing the method statement typically falls to the project manager or site supervisor, but it can vary depending on the size and complexity of the project. On large, multi-contractor sites, the main contractor may take the lead in developing the statement, ensuring all subcontractors adhere to a unified approach.

For smaller teams or single-task jobs, the responsibility may lie with a qualified health and safety officer. Regardless of who drafts the method statement, it’s crucial that all stakeholders review and agree on its content before work begins.

Examples of a Method Statement

An effective method statement might look like this:

Method Statement

Task: Installation of Steel Beams
Scope: To install steel beams for a commercial building framework.
Steps:

  1. Prepare the site and clear debris.
  2. Mark out beam positions.
  3. Ensure lifting equipment is inspected and in good working order.
  4. Secure the area with barriers and restrict access to authorised personnel.
  5. Erect the beams using appropriate lifting gear.
  6. Check the positioning and secure the beams.

Risk Assessment:

  • Hazard: Falling beams.
  • Control Measure: Use of certified lifting equipment and trained operators.

Roles and Responsibilities:

  • Project Manager: Oversees the operation and ensures compliance with regulations.
  • Lifting Supervisor: Ensures safe use of lifting equipment.
  • Safety Officer: Monitors the site for safety hazards.

Writing a Method Statement

Writing a method statement involves careful planning and attention to detail. It’s not just a formality but a vital tool that ensures safety, compliance, and clarity across all levels of the project. Involving all relevant stakeholders and ensuring the document is regularly updated will help you address potential risks and maintain high standards throughout the project's lifecycle.

For companies looking to digitise this process, Paperless offers a comprehensive digital solution. With our platform, you can streamline method statement creation, ensure compliance, and maintain real-time updates across teams, reducing the risk of miscommunication and enhancing safety on site.

Method Statement Toolkit

Struggling with Method Statements?

Unlock our advanced templates, expert tips, and real-world examples inside the Complete Method Statement Ebook for just £27 — plus free access to RAMS GPT to generate professional RAMS instantly.

Download Now
References
Vector Solutions | SiteDocs | EHS Insight | Evolved Safety | HQSuite
Share

Related posts

Risk Assessment Example Construction
26/02/2026

Risk Assessment Example (UK Construction) + (DOCX) Template


Read more
Method Statement Examples Construction
26/02/2026

Method Statement (UK Construction) + (DOCX) Template


Read more
RAMS Examples Construction (3)
25/02/2026

RAMS Template (DOCX) + RAMS Example for UK Construction


Read more
Is AI RAMS compliant in the UK?

What “compliant” really means in practice, and how to align AI drafts with duty-holder responsibilities and evidence.

17/02/2026

Is AI-generated RAMS compliant in the UK? | Guidance


Read more

Company

  • About Us
  • Contact Us
  • Compliance
  • Changelog

Compliance

Cyber Essentials Certified

Affiliations

We plant trees with Ecologi C-Tech Club Supporter

Downloads


Apple App Store Icon

Play Store Icon

© 2026 Paperless. All Rights Reserved | Privacy Policy
Book a demo
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.